Govt crafts multi-pronged strategy for electricity supply in summer months
The Ministry of Power has also directed NTPC to run its 5000 MW gas-based power stations during the crunch period in April-May.
The Ministry of Power has also directed NTPC to run its 5000 MW gas-based power stations during the crunch period in April-May.